欢迎访问永诚广建公路材料(山东)有限公司网站!

永诚广建公路材料(山东)有限公司

热线电话

13065071658
15165180688

您现在所在的位置 :首页 - 新闻中心 > 公司新闻

公司新闻

冷补沥清生产过程中要特别注意的事情

来源:http://www.ycgjglcl.com/ 日期:2023-01-09
冷补沥青是公路施工常常应用到的材质,应用次数特别高,并且应用后的作用也特别明显,驾驶更稳定、地面更美观大方、使用年限更长、修复起来也更便于,也由于这种优势的存有,该材质特别受大家喜爱,那麽你对该商品的生产制造有哪些掌握吗?下边济南沥青生产厂家就为各位简易介绍一下冷补沥清生产过程中须要特别注意的事情吧。
Cold patched asphalt is a material often used in highway construction. It has been used for a very high number of times, and has a particularly obvious effect after application. It is more stable for safe driving, more beautiful and generous ground, longer service life, and easier to repair. Because of this advantage, this material is particularly popular. What do you know about the production of this product? Next, Jinan asphalt manufacturer will briefly introduce the matters needing special attention in the production process of cold patching asphalt.
1、制得石油沥青的加温的温度不能高过140℃。在制得全过程中,先加上柴油机,再放进添加剂。改性材料后的沥清温控在100-120℃中间,搅拌均匀。
1. The heating temperature of petroleum asphalt shall not be higher than 140 ℃. In the whole process of preparation, the diesel engine is added first, and then the additives are added. The asphalt temperature of the modified material shall be controlled between 100-120 ℃ and stirred evenly.
2、搅拌时,倘若石头是干的,冷补沥青可以用强制性式搅拌装置搅拌。当它不干躁时,可以用文火或无火的搅拌装置混和,如此一来可以控制成本。干躁的温度不能高过80℃。
2. When mixing, if the stone is dry, the cold patched asphalt can be mixed with a mandatory mixing device. When it is not dry, it can be mixed with a slow fire or a flameless stirring device, so that the cost can be controlled. The temperature of dryness shall not be higher than 80 ℃.
济南沥青生产厂家
3、生产制造出来的冷补沥清用布袋子计量器包装,有益于储存和运输,可以提升储存时间,为财务核算产生稳定的根据。
3. The cold make-up asphalt produced by the manufacturer is packed with cloth bag metering device, which is beneficial to storage and transportation, can improve the storage time and generate a stable basis for financial accounting.
4、碱石是有效的挑选,矿渣微粉的含水量小于2%,油石比可降低0.3-0.5%。
4. Alkali stone is an effective selection. The water content of slag powder is less than 2%, and the oil stone ratio can be reduced by 0.3-0.5%.
5、冷补沥青进深125px以上的基坑应逐步压实。填平时要均匀,比地面高0.5-37.5px。捣实后,在坑的表面均匀铺地上一层层石头或细沙,整洁,使细沙添充坑的表面空隙。
5. The foundation pit with cold patched asphalt deeper than 125px shall be compacted gradually. The filling shall be even, 0.5-37.5px higher than the ground. After tamping, the surface of the pit shall be evenly paved with layers of stones or fine sand to eliminate tidiness and make the fine sand fill the surface space of the pit.
以上就是问题“冷补沥清生产过程中要特别注意的事情”的相关解答内容了,您对此有怎样的问题或者需求,可以随时来我们网站http://www.ycgjglcl.com进行了解咨询!
The above is the answer to the question "What should be paid special attention to during the production of cold fill asphalt". If you have any questions or needs, you can come to our website at any time http://www.ycgjglcl.com Get to know!
  • 上一条:不同路面机械设备的使用方式
  • 下一条:水稳搅拌站的修理方法
  • 相关产品: