很多市政小修、小区道路翻新,第一反应是“压路机多压几遍”。但沥青路面早期掉粒、车辙、裂缝,八成在拌合站就已经定了结局:油石比偏低,骨料裹不住;级配偏细,高温稳定性差;出厂温度掉到160℃以下,到现场已经“夹生”。

Many municipal minor repairs and road renovations in residential areas have the first reaction of "rolling the road multiple times with a roller". But in the early stages of asphalt pavement, particle shedding, rutting, and cracking, 80% of them have already determined the outcome at the mixing station: the oil stone ratio is low, and the aggregate cannot be wrapped up; Fine grading and poor high-temperature stability; The factory temperature dropped below 160 ℃, and by the time it arrived at the site, it was already "stuck".

沥青料1

选济南本地沥青料,先问四件事:

When choosing local asphalt materials in Jinan, there are four things to ask first:

级配类型:AC通用、SMA抗车辙但贵、ATB用于下面层,别拿人行道料铺消防通道;

Grading type: AC universal, SMA anti rutting but expensive, ATB used for the lower layer, do not use sidewalk materials to pave fire exits;

石料岩性:玄武岩、辉绿岩等碱性硬岩与沥青粘附性好,石灰岩成本低但重载路口易推挤;

Rock type of stone: alkaline hard rocks such as basalt and diabase have good adhesion with asphalt. Limestone has low cost but is prone to pushing at heavy-duty intersections;

油石比窗口:不是“越多越黑越好”,过油会泛油、追尾式车辙,得看马歇尔击实和动稳定度报告;

Oil stone ratio to window: It's not like 'the darker the more, the better'. Over oiling can cause oil spillage and rear end wheel ruts, which depend on Marshall compaction and dynamic stability reports;

出厂与到场温差:5000型拌合站优势就在温控稳,夏季出厂165–175℃、到场不低于145℃,不然突出完里面还是生料。

Temperature difference between factory delivery and arrival: The advantage of the 5000 type mixing station lies in stable temperature control. In summer, the factory delivery temperature is 165-175 ℃, and the arrival temperature should not be lower than 145 ℃, otherwise the raw material will still be inside after compaction.

工地端也别甩锅给材料:运输不盖篷布,温度半小时掉20℃;摊铺机熨平板没预热,起步就离析;钢轮不喷水雾控制、胶轮不擦隔离剂,都会把好料作废。

Don't throw the blame on the materials at the construction site: transport without tarpaulin, the temperature drops by 20 ℃ in half an hour; The paving machine's ironing board is not preheated and separates at the beginning; If the steel wheel is not sprayed with water mist control and the rubber wheel is not wiped with isolation agent, the good material will be invalidated.

真省钱的算法不是“吨价非常低”,而是:单价×返修率+封路误工成本。小区路面、厂区通道、市政养护这种场景,料稳、温稳、级配对,比砍下5块钱一吨实在得多。

The algorithm that truly saves money is not "lowest price per ton", but: unit price x repair rate+cost of road closure and delay. The scene of stable materials, stable temperature, and graded matching in residential road surfaces, factory passages, and municipal maintenance is much better than cutting 5 yuan per ton.

本文由济南沥青料友情奉献.更多有关的知识请点击:http://www.ycgjglcl.com我们将会对您提出的疑问进行详细的解答,欢迎您登录网站留言.

This article is contributed by Jinan Asphalt Material Friendship For more information, please click: http://www.ycgjglcl.com We will provide detailed answers to your questions. You are welcome to log in to our website and leave a message

  • 上一条:路面铺完没多久就开裂,问题可能出在你看不见的那一层
  • 下一条:
  • 相关产品:

    相关新闻: